An Independent School

An Independent School | Biomass Pellets

An Independent School | Biomass Pellets

An Independent School | Biomass Pellets

This Independent boarding school for boys and girls aged from 2 to 13 is situated in a magnificent Grade 11 listed building set in beautiful parkland in the Sussex countryside.

The School was using heating oil in the main building as well as the remote classrooms and was attracted to both the potential savings as well as the educational message that switching to renewables would deliver.

Mi-Generation installed two external containerised biomass boiler rooms which linked to the main house heating system and the boilers used to heat the classrooms. These were then clad in a light wood finish to fit in with their settings.

Project Details

  • Installation Cost : £128,000
  • Payback Period: 4 years